Gas Processing Facility Design Review
Design PhaseJul 2025
Projects/Gas Processing Facility Design Review

Gas Processing Facility Design Review

A large-scale design review for a sour-gas processing facility, covering safety, standards compliance, environmental readiness, and implementation recommendations.

ClientPT Pema Global Energi
LocationLhoksukon, Aceh Utara
ServiceDesign Phase
Scope TagsDesign Review • Gas Processing Facility • Process Safety
Executive Snapshot

A faster way to understand the engagement

FacilityGas Processing Facility (GPF)
Design Capacity60 MMSCFD
LocationLhoksukon, Aceh Utara
Design Life20 years
Project Overview

What this project covered

This project reviewed the design of a 60 MMSCFD Gas Processing Facility intended to support safe and compliant operation from early implementation onward. The work covered design basis verification, process and utility review, fire and gas systems, environmental documentation, TKDN considerations, and the broader engineering completeness of the facility package.

Technical Facts

Structured data pulled from the project basis

Feed Gas TypeSour gas
Natural Gas Pressure750 psig
Natural Gas Temperature120 °F
Normal Flowrate55 MMSCFD
Max Sales Gas CO₂8 %vol
Max Sales Gas H₂S4 ppm(v)
Work Scope & Method

How the assignment was executed

01

Verify DEDC document package

The review was anchored to the issued design package, including process simulation, PFDs, P&IDs, calculations, and supporting engineering documents.

02

Assess safety, process, and environmental readiness

The report evaluates standards usage, process and non-process risk, environmental documentation, and installation suitability in one integrated design review.

03

Check long-term operability

Electrical, instrument, fire protection, hazardous area, and grounding systems were evaluated to support reliable operation over the intended design life.

Challenge

Context and delivery pressure

The client needed a review that could go beyond document collection and actually connect process safety, technical standards, environmental obligations, and installation readiness into one coherent engineering judgment.

Approach

How the work was structured

We built the review around design-basis alignment, standards mapping, technical-package traceability, and targeted recommendations so the project team could move forward with stronger safety clarity and better documentation discipline.

Key Findings

Important technical takeaways

The design review is broad and deeply document-based

This project is backed by a large technical package, which makes it suitable to present as a structured case study rather than a plain-text summary.

Safety systems were reviewed in measurable terms

The report records fire and gas detection coverage, grounding performance, hazardous-area classification, and minimum separation logic in a way that can be surfaced cleanly in UI cards.

Deliverables

Key outputs from the engagement

  • 01Design basis and document review
  • 02Process safety and protection review
  • 03Environmental and TKDN evaluation
  • 04Technical recommendations and readiness note